Queen Elizabeth University Hospital

Glasgow - Scotland

The 14 floor Queen Elizabeth University Hospital, Glasgow (adult) building is one of the largest acute hospitals in the UK and home to major specialist services such as renal medicine, transplantation and vascular surgery, with state-of-the-art Critical Care, Theatre and Diagnostic Services.

A project of this size was always going to need an advanced PDMS system and that is where Multiplex believed that Zutec had the solution. This would be attributed mainly due to the scale of the project, but also, the types of Fabric & Services installed on this project are very advanced/modern. 

From the ETFE roofing to the Helipad, and the AGV underground system to the Building Maintenance Unit, this is a very modern project and the client needed an advanced handover facility like the Zutec system to match. 

The Zutec System on the Queen Elizabeth University Hospital is mainly used as a Project Database Management System & Online Collaborative tool for completing and sharing Operation & Maintenance Manuals. 

The setup here also assists with Project Handover by eliminating hard copy delivery. Zutec on the Glasgow Project ensured timely completion O&M Manuals, As Built Drawings, Health & Safety files, Building Log Books, Asset & Equipment Schedules and Compliance Documentation. 

All the Asset & Equipment schedules were migrated to the NHS FM Management team to suit their format, so there is great flexibility with what the client can do with all the information gathered throughout the project. 

The key aspect in relation to this project is a good customer relationship and the service delivery offered. In theory, companies can have an inadequate system and still have a good relationship which would enable them to progress. But Zutec can not only offer a good system but they offer a great support service and this project has got it all – which is a ‘win win’ situation for all parties involved.

Queen Elizabeth Hospital

cost

Cost

£800,000,000

50x50xGrossArea.png.pagespeed.ic.PgaPu_UEOB

Gross Area

85,263m²

Who Was Involved

50x50xarchitect.png.pagespeed.ic.sW9LNGYOjw

Architect

Night In Gales Architects

icon-2

Engineer

Mercury Engineering

developer

Civil Engineer

WSP

Main Contractor

Contractor

Brookfield Multiplex

 

 

 

New call-to-action

You might like this:

04 Jul 2019 | Projects, Projects - Planners, Government

HSE - Health Service Executive

HSE - Health Service Executive

Ireland

04 Jun 2019 | Projects, Projects - Planners

Royal Albert Dock

Royal Albert Dock

London - United Kingdom