Principal Tower

Principal Place Residential

London - United Kingdom

Principal Tower, designed by Foster + Partners, is the landmark residential tower within Principal Place, a mixed-use development on the edge of the City of London in the borough of Hackney. The tower is a 175 meters high, elegant structure containing over 280 apartments arranged over 50 floors.  The tower will provide a mixture of one, two and three bedroom units as well as a duplex penthouse spread over a total of 322,500 sq ft together with 5,000 sq ft of leisure facilities including an indoor swimming pool and gym.

Multiplex are the main contractors on this project who in turn have contracted the Zutec platform for several of their processes.  The Task Management tool was used as the main Quality Assurance collaboration platform for the project. Multiplex used this to capture all tasks such as snags, defects, observations, incomplete works, outstanding works and clean up notices and raise them against the responsible subcontractors. The Client Representatives, Multiplex and all subcontractors use this tool to collaborate and resolve all issues captured onsite. The Task Management tool also provided detailed insights and analytics through the embedded and interactive dashboarding on the Zutec Platform.

The Zutec Construction Progress Tracker was used to capture every Fit-Out Construction Activity in the building. All of the supply chain used the tool to record their Construction activity progress room by room and also attach corresponding QA documentation and As-Built dates. This granted Multiplex a real-time insight into Construction Progress vs Plan and Quality Assurance through the in-depth dashboard reporting from the Zutec Platform.

The Daily Site Diary & Observations tool was used by all onsite staff to record the daily site activities and observations such as subcontractor labour count, environmental observations, delays, progress etc.

As with any multi million pound development, project handover is a key component in completion and the Zutec Digital O&M capturing platform was used as a collaboration tool for all subcontractors to upload all of the required handover information which is essential for a smooth handover and successful running of the building post-handover. All information uploaded was brought through a workflow and validated by the various certifiers. The Zutec Digital O&M tool provided real time reports on the handover documentation progress which enabled Multiplex to effectively track and capture all the required documentation in time for handover.

Principal Tower

cost

Cost

£200m

50x50xGrossArea.png.pagespeed.ic.PgaPu_UEOB

Gross Area

600,000 sq ft

Who Was Involved

50x50xarchitect.png.pagespeed.ic.sW9LNGYOjw

Architect

Foster + Partners

icon-2

Services Engineer

Hurley Palmer Flatt

developer

Structural Engineer

WSP

Main Contractor

Main Contractor

Multiplex

 

New call-to-action

You might like this:

04 Jun 2019 | Projects, Projects - Planners

Royal Albert Dock

Royal Albert Dock

London - United Kingdom

04 Jun 2019 | Projects, Projects - Planners

80 Charlotte Street

80 Charlotte Street

London - United Kingdom